Customization: | Available |
---|---|
Certification: | ISO9001 |
Standard Component: | Non-Standard Component |
Still deciding? Get samples of US$ 10/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Detailed Image:
Standard:
Chemical Composition and Mechanical Performance:
Table 1- Chemical composition |
||||||
Steel Grade |
C% |
Si% |
Mn% |
P% |
S% |
AL% |
E215 |
≤0.10 |
≤0.05 |
≤0.7 |
≤0.025 |
≤0.025 |
≥0.025 |
E235 |
≤0.17 |
≤0.35 |
0.4-1.2 |
≤0.025 |
≤0.025 |
|
E255 |
≤0.21 |
≤0.35 |
0.4-1.1 |
≤0.025 |
≤0.025 |
|
E355 |
≤0.22 |
≤0.55 |
≤1.6 |
≤0.025 |
≤0.025 |
Table 2 - Mechanical properties at room temperature |
|||||||||
Delivery Condition |
BK |
BKW |
GBK |
NBK (N) |
|||||
Steel Grade |
Rm |
A % |
Rm |
A % |
Rm |
A % |
Rm |
ReH |
A % |
Mpa (Min) |
(Min) |
Mpa(Min) |
(Min) |
Mpa(Min) |
(Min) |
Mpa(Min) |
Mpa(Min) |
(Min) |
|
E215 |
430 |
8 |
380 |
12 |
280 |
30 |
290~430 |
215 |
30 |
E235 |
480 |
6 |
420 |
10 |
315 |
25 |
340~480 |
235 |
25 |
E255 |
580 |
5 |
520 |
8 |
390 |
21 |
440~570 |
255 |
21 |
E355 |
640 |
4 |
580 |
7 |
450 |
22 |
490~630 |
355 |
22 |
Other Specification:
End Shape |
Beveled end, plain end, vanished, or adding plastic caps to protect the two ends as per customer's requirements |
|
Surface Treatment |
Oiled, Galvanized, Phosphate etc |
|
Technique |
Cold drawn & cold rolled |
|
Application |
1. Automotive and mechanical pipes |
|
2. Petroleum cracking pipes |
||
3. High Pressure Boiler Pipe |
||
4. Low and middle pressure fluid transportation pipeline |
||
5. Chemical fertilizer equipment pipes |
||
6. Heat exchanger pipes |
||
Delivery Conditions |
1. BK (+C) |
No heat treatment after last cold forming process. |
2. BKW (+LC) |
After last heat treatment there is a light finishing pass (cold drawing) |
|
3. BKS (+SR) |
After the final cold forming process the tubes are stress relieve annealed. |
|
4. GBK (+A) |
After the final cold forming process the tubes are annealed in a controlled atmosphere. |
|
5. NBK (+N) |
After the final cold forming process the tubes are annealed above the upper transformation point in a controlled atmosphere. |
|
Package |
1. Bundle Packing. |
|
2. Plain end or vanished as per customer's request. |
||
3. Wrapped in waterproof paper. |
||
4. Sackcloth with several steel strips. |
||
5. Pack in heavy tri-wall boxes. |
Steel bar from steel plant→Physical and chemical inspection→Surface treatment →Cutting → Heating→Hot piercing→Shell storage→Pickling and lubrication→Cold rolling→Heattreatmen →Pickling and lubrication→Cutting→Punching→Cold drawn→Size inspection→Outer and inner surface cleaning→NBK or GBK→Mechanics inspection→Chemical analysis
Antlrust oil palnting→print→packing→flnished storage→Dellivery with quality certificate
1.We adopt special techniques and special skill in the acid cleaning process to deal with the place where it's easy to form fold crevice;
2.Well organized process,especially annealing treatment in a severely technical manner;
3.In respect with lubrication,we adopt the international advanced level treating process in the world,and put the surface quality of our productsunder strict control in order to prevent causing surface crack.
Certificate:
Certificates:
According to EN 10204 3.1
Inspection Items:
Tensile stength, Yield stength, Elongation, Flattenging, FlaringChemical analysisEddy Current
Test 100%, Size and surface checking 100%Other test item can be arranged as per request